1916 - Construction of K1 & K2 Submarines
14th November. Submarines K.1 and K.2 floated up from the No. 13 Dry Dock in which they were built and followed later by K.5.
14th November. Submarines K.1 and K.2 floated up from the No. 13 Dry Dock in which they were built and followed later by K.5.