Loader

1923 - Closure of M Caisson

4thJanuary. ‘M’ caisson on the north wall of No 3 Basin was closed and sealed. This entrance gave access to the basin from Fountain Lake and at one time was the only access into the Basin for the Dreadnought when in deep condition . This was one of the main consideration for building the C & D locks.