Loader

1875 - Great Extension Docks Opened

29th May. The Deep Dry Dock (No. 9 Dock), North Lock (B. Lock), South Lock (A. Lock), Tidal Basin and the Repairing Basins

were opened (see 1864).

1875 - Great Extension Docks Opened