Loader

1801 - Dockyard Works

Works to the South Dock (No. 2 Dry Dock) in the Great Basin and drains - £9663. 1s. 4d.

Works to the new South East Dock (No. 3 Dock) in the Great Basin and drains are - £10,099.12s. 6d.

Taking out earth to the depth proposed, clearing away dam, and completing granite walls of the Great Basin - £2540. 5s. 8d. (Final bill for said job.)